and here's a ten page SoW I received from the boss today..






Statement
of Work (SOW)



For
the



Online
Task Scheduler




This document
specifies the work requirements for a fully functional



Web based task
monitoring and scheduling software



Prepared
for:




Interim Software Services



CSD





by:





Shiji
Varghese


Module
Development Services



CSD




REVISION
HISTORY
























































Revision



Description
of Changes



Prepared


By



Date



Draft
#1




First
draft.



MDS



10/18/07















































Table
of Contents




1. SCOPE 4


1.1 Background 4


2. Applicable Documents 5


2.1
Specifications 5


3. Requirements 5


3.1 General 5


3.2 Detail Tasks 5


3.2.1 Schedule 5


3.2.2 Module
Status 6


3.2.3 User
Management 6


3.2.4 Latest News
and Reviews 6


3.2.5 3.3
Prototype 6


3.4 Preliminary
Testing 6


3.5 Preparation
of Qualification Test Plans 7


3.2.6 3.5.1
Pre-Qualification Investigation 7


3.5.2
Qualification Readiness 7


3.5.3
Qualification Testing 8


3.3 3.6
Program Management 8


3.3.1 3.6.1
Program Manager 8


3.6.2 Project
Schedule 8


3.4 3.7 Quality
Assurance 8


3.5 3.8
Customer Meetings 9


4 Items to be FURNISHED BY ISS 9


4.1
Documentation 9


4.2 Referenced
Documents 9


5 ITEMS to Be Delivered by iss 9


6 PLACE OF PERFORMANCE 10


7 EXCLUSIONS 10


8 CHANGES 10


8.1 SOW 10


8.2 Action
Items 10





STATEMENT
OF WORK


SCOPE



ISS shall perform all tasks necessary to design,
develop, test and deliver the software for MDS in accordance with
this SOW and referenced documents.



Background



The Online task scheduler is
meant to provide a user interface for the regular user to update his
work schedule for the day on a daily basis. It also provides him an
interface to update his progress on any assigned task on a daily or
weekly basis. This helps the manager in charge and the COO to monitor
the daily task in progress and the assigned task in progress
respectively.



The manager will have the
privileges to assign/add/delete or modify the task for any team
member, to create a set of task, modify the client delivery status of
each of the task in a set. The manager must like any other user be
able to update his work schedule for the day.



The administrator or COO will
have the permission to view the tasks per day and also the progress
of each task under a user



Upon logon every user must be
presented with a welcome page which will display the current news and
happenings in the team and in the entire organization. This
information must be updated by a user appointed or specified by the
manager










Applicable Documents


Specifications














































DOCUMENT
NUMBER




TITLE




RELEASE
DATE




SR-01




System
Requirements Specification




10-17-07




T-01




Project
Development Timeline




10-18-07




M-01




Minutes
of Update meetings







PTS-01




Preliminary
Test Report







QT-01




Qualification
Test Report






Table
1 - OTS Specifications


Requirements


General


ISS
shall design and develop a system that meets the requirements of the
SRS in accordance with the tasks listed in the section 3.2.


Detail Tasks


Schedule


ISS
shall prepare browser based User interface which will facilitate the
user and the manager to update his daily task for the day under two
time sessions namely morning session and afternoon session. Every
user including the manager will be able to view the list of task each
user is handling on a day under two time sessions namely morning
session and afternoon session.


Module Status


ISS
shall prepare an option in the browser based User interface which
will facilitate the manager to create a set of modules or tasks and
assign it to each user. This set of modules or task can be viewed by
each of the user, the manager and the COO. Once a set of task is
created and a user is assigned to a task, every user including the
manager should be able to enter his start date upon beginning of the
assigned task and must be able to enter his end date upon finishing
the task.



The
COO should be able to view the module / task status in read only
format.


User Management


ISS
shall prepare an option for the manager to add a user, to delete a
user and to modify user information.


The
manager should be able to change his own password.


Latest News and Reviews


The
welcome page will contain a scroll window which will have the latest
news (meetings, team updates, module development related news, lab
etc). This page is viewable by users of all levels (user, manager and
COO)



3.3 Prototype


ISS shall prepare the
prototype software for the windows environment with sufficient
capabilities to support needs of preliminary testing,
pre-qualification testing and delivery over a Linux server.




3.4Preliminary Testing


ISS shall perform
preliminary design tests using the prototype software. This testing
will focus on functional verification. Once the prototype has passed
the functional section it shall be deemed to be usable in a Proof of
Design. A limited Report will document the results of this
functional test.









3.5Preparation of Qualification Test Plans


ISS
shall prepare the document steps necessary to test the prototype in a
Linux server environment.


3.5.1 Pre-Qualification Investigation


ISS shall perform
pre-qualification investigation on the Linux server whenever required
by nature of the test, this investigation will be performed using the
relevant database and web server in the Linux platform for a
functional test.


The testing shall be
performed on the Linux server environment and tests results shall be
recorded. MDS may elect to witness this testing at any time during
the project, and may request testing results at any time. Testing
results shall be documented and maintained as a hard copy under the
above heading.


3.5.2Qualification Readiness


Using the results of
pre-qualification investigation, ISS shall perform all necessary
design remediation and re-testing to achieve compliance with
specified Linux server environment.


3.5.3Qualification Testing


ISS shall perform
necessary qualification testing according to the QTPs. MDS may elect
to witness this testing at any time during the project, and may
request testing results at any time. Testing results shall be
documented and maintained as a hard copy under the above heading.


The prototype
subjected to such testing shall be preserved for delivery to MDS.



3.6 Program Management


3.6.1 Program Manager


A
program manager shall be designated by ISS who shall possess singular
authority to plan and direct the successful efforts described in this
SOW.


3.6.2Project Schedule


ISS
shall provide and maintain a project schedule. This schedule may be
coordinated with any overall master schedule provided by MDS. Each
schedule shall plainly identify milestone tasks and critical path.



Task
definition on the project schedule shall be defined to a level that
yields events that last no greater than a two-week period. In
addition, the schedule shall include all major program milestones
that identify the deliverables, interdependencies and development
release points, and design review milestones. Any external
constraints shall also be shown. The level of detail may be altered,
as agreed among the parties, to reflect critical items of interest.


3.7 Quality Assurance


ISS shall implement a
quality assurance system that ensures all products and documentation
to be delivered hereunder meet the requirements of this SOW and that
the products meet the quality standards approved by Buyer, as stated
in the Purchase Contract (here MDS).


3.8 Customer Meetings


CDI
shall make available its designated program manager for alternate day
meetings with MDS representatives to discuss project status, schedule
and coordination of project efforts requiring participation of both
parties. The frequency and time of these meetings may be altered by
mutual agreement. These meetings may be held in-person,
telephonically, or by videoconference. ISS will generate and
distribute minutes of each meeting within 24 hours of occurrence.


4Items to be FURNISHED BY ISS


Articles described under this section shall be
furnished by ISS to MDS without cost, solely for use by ISS in
fulfilling its obligations under this SOW.


4.1Documentation


Detailed documentation
of the project design (work flow) shall be supplied to ISS in
mutually agreeable format upon commencement of work.


4.2Referenced Documents


Copies of all
documents referenced in section 2, as well as documents to which
these documents may refer, shall be supplied to MDS upon request in a
mutually agreeable format.


5ITEMS to Be Delivered by iss


All
documentation shall be delivered in paper copy as well as
electronically. Test procedures, reports, project status,
instructions, and other data shall be delivered using MS Word, Excel
and Project formats.


All
documentation shall be subject to MDS approval, and all test
procedures, and reports, must be approved by the MDS prior to formal
publication.


  1. Work Flow Documentation


  2. Final Test Reports


  3. Online Task Scheduler Software in an archived
    format


  4. QTP


  5. Test Reports and Articles









6PLACE OF PERFORMANCE


All
work arising from this Agreement shall be performed at ISS’s
facilities in Waveaxis, Koramanagala, Bangalore, or at the facilities
of ISS subcontrators. Travel to the Waveaxis facility by CDI is
limited to those activities specifically required by this SOW.
Travel expenses, including air, auto, meals and lodging, in excess of
this limitation or to any other location will be reimbursed to ISS at
cost in accordance with policies established for the Customer’s own
employees.


7EXCLUSIONS


The following activities are specifically excluded
from this SOW.


8CHANGES


8.1SOW


All changes to this
SOW shall be mutually agreed upon in writing by MDS and CDI before
becoming effective.


8.2Action Items


Verbal or written
“action items” or similar informal commitments made during the
project shall not be considered binding to the extent that they would
extend the scope of either party under this SOW.